TD Kontakt LLC manufactures custom underground waste storage systems based on drawings, technical specifications or specified parameters. The system includes an underground concrete bunker, containers, a hydraulic lifting mechanism and an above-ground section. For waste collection, the platform with the containers is hydraulically raised to ground level.

A hydraulic lift raises the entire platform with the containers to the surface. The system occupies very little space above ground, with only the waste disposal columns remaining visible.

Our in-house production capabilities enable us to manufacture the metal structures and system components in accordance with the required technical parameters.

Systems are manufactured to individual order. To receive a quotation, please provide drawings, a technical specification or the main product parameters.

Send request

Key advantages

Efficient Use of Urban Space
Most of the system is located underground, with only the waste disposal columns remaining above ground.
High Capacity
Several containers can be installed in a single underground bunker.
Convenient Servicing
The hydraulic mechanism enables quick lifting of the containers to the surface for waste collection.
Custom Manufacturing
The system is designed and manufactured according to the required technical parameters and installation conditions.
In-House Production Capabilities
Key machining operations are performed at the company’s own production facilities.

Our production facilities

CNC Lathes. Machining of workpieces with an outer diameter of up to 450 mm and a length of up to 530 mm. Machining accuracy: up to 0.005 mm.
CNC Lathes. Machining of workpieces with an outer diameter of up to 450 mm and a length of up to 530 mm. Machining accuracy: up to 0.005 mm.
Conventional Lathes. Machining of large workpieces with an outer diameter of up to 1,100 mm and a length of up to 2,000 mm.
Conventional Lathes. Machining of large workpieces with an outer diameter of up to 1,100 mm and a length of up to 2,000 mm.
CNC Milling Machines. Machining of workpieces up to 500 × 500 × 500 mm with accuracy up to 0.01 mm.
CNC Milling Machines. Machining of workpieces up to 500 × 500 × 500 mm with accuracy up to 0.01 mm.
Welding and Hardfacing Equipment. We perform arc welding, gas-shielded semi-automatic welding and TIG welding.
Welding and Hardfacing Equipment. We perform arc welding, gas-shielded semi-automatic welding and TIG welding.
Hydraulic and Pneumatic Test Equipment. We test finished products on hydraulic test benches at pressures up to 40 MPa, as well as on pneumatic test benches.
Hydraulic and Pneumatic Test Equipment. We test finished products on hydraulic test benches at pressures up to 40 MPa, as well as on pneumatic test benches.

Stages of work

  1. 1
    Technical Specification Review
    We review the drawings, technical specification or main parameters of the required underground waste storage system.
  2. 2
    Technical Parameter Approval
    We clarify the required characteristics and operating conditions.
  3. 3
    Design and Production Preparation
    We develop or adapt the design and select materials, components and hydraulic equipment.
  4. 4
    Structure Manufacturing
    We manufacture the platform, lifting mechanism components, protective structures and other system components.
  5. 5
    Equipment Assembly and Installation
    We assemble the system and install the hydraulic lift, containers, above-ground section and control system.
  6. 6
    Testing and Delivery to the Customer
    We test the lifting mechanism, structural reliability and compliance with technical requirements. The completed system is prepared for installation and operation.